A platform for research: civil engineering, architecture and urbanism
Construction Technology of the New Cast-in-Place Concrete Pile with Half-Screwed
Construction Technology of the New Cast-in-Place Concrete Pile with Half-Screwed
Construction Technology of the New Cast-in-Place Concrete Pile with Half-Screwed
Li, X.H. (author) / Gao, Y.Y. (author) / Yue, C.X. (author) / Wang, C.W. (author) / Tian, Li / Hou, Hetao
International conference; 3rd, Civil engineering, architecture and building materials ; 2013 ; Jinan, China
2013-01-01
4 pages
Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction Technology of the New Cast-in-Place Concrete Pile with Half-Screwed
Trans Tech Publications | 2013
|Analysis the Bearing Force Characteristic of the New Cast-in-Place Concrete Pile with Half-Screwed
British Library Conference Proceedings | 2013
|Analysis the Bearing Force Characteristic of the New Cast-in-Place Concrete Pile with Half-Screwed
Trans Tech Publications | 2013
|Estimation of pile beating capacity of cast-in-place screwed piles
British Library Conference Proceedings | 1998
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|