A platform for research: civil engineering, architecture and urbanism
Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
An, H. (author) / Tang, S.Y. (author) / Wang, R. (author) / Hou, Hetao / Tian, Li
International conference; 3rd, Civil engineering, architecture and building materials; Architecture, building materials and engineering management (CEABM 2013), May 24-26, 2013, Jinan, China / ; 2013 ; Jinan, China
2013-01-01
7 pages
Based on those presented at the conference. Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
Trans Tech Publications | 2013
|Risk Analysis of Hydropower Construction Project Based on Fuzzy Comprehensive Evaluation
British Library Conference Proceedings | 2013
|Risk Analysis of Hydropower Construction Project Based on Fuzzy Comprehensive Evaluation
Tema Archive | 2013
|