A platform for research: civil engineering, architecture and urbanism
Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum
Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum
Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum
Man, S. (author) / Yang, Weijun / Liang, Jianguo
International conference; 2nd, Civil, architectural and hydraulic engineering ; 2013 ; Zhuhai, China
Civil, architectural and hydraulic engineering ; 1326-1329
APPLIED MECHANICS AND MATERIALS ; 405/408
2013-01-01
4 pages
Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum
Trans Tech Publications | 2013
|Lagged Surface Collapse Mechanism of Shield Construction in Sandy Pebble Stratum
British Library Online Contents | 2013
|Prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum
DOAJ | 2024
|Prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum
Elsevier | 2024
|