A platform for research: civil engineering, architecture and urbanism
The Analysis of the Engineering Change Impact on Project Cost Based on the Quantities Bill Valuation
The Analysis of the Engineering Change Impact on Project Cost Based on the Quantities Bill Valuation
The Analysis of the Engineering Change Impact on Project Cost Based on the Quantities Bill Valuation
Li, J. (author) / Xu, Z.R. (author) / Yang, Weijun / Liang, Jianguo
International conference; 2nd, Civil, architectural and hydraulic engineering ; 2013 ; Zhuhai, China
Civil, architectural and hydraulic engineering ; 3459-3462
APPLIED MECHANICS AND MATERIALS ; 405/408
2013-01-01
4 pages
Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Unbalanced Quotation Improvement Strategy Research under the Bill of Quantities Valuation Mode
British Library Conference Proceedings | 2014
|Research on Claim Opportunity and Tactics based on the Valuation Mode with Bill of Quantities
British Library Conference Proceedings | 2005
|The development of a rational bill of quantities
Taylor & Francis Verlag | 1990
|Construction Project Cost Control under the Mode of List Valuation
British Library Conference Proceedings | 2013
|TIBKAT | 1987
|