A platform for research: civil engineering, architecture and urbanism
The 3 C's of Water Main Pipe Rehabilitation: Cured-in-Place Structural Pipe Lining, Cooperative Agreements, and Competitive Bidding
The 3 C's of Water Main Pipe Rehabilitation: Cured-in-Place Structural Pipe Lining, Cooperative Agreements, and Competitive Bidding
The 3 C's of Water Main Pipe Rehabilitation: Cured-in-Place Structural Pipe Lining, Cooperative Agreements, and Competitive Bidding
Pasko, P. (author) / Hoeft, M.R. (author) / American Water Works Association
Annual Conference, American Water Works Association; annual conference and exposition 2013 (ACE 13) ; 2013 ; Denver, CO
2013-01-01
24 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
`Cured in place' pipe lining system
British Library Online Contents | 2009
CURED-IN-PLACE PIPE REHABILITATION PROCESS AND SUCH CURED-IN-PLACE PIPE
European Patent Office | 2017
|Sewage Force Main Rehabilitation using Cured-in-Place Pipe Technology
British Library Conference Proceedings | 1999
|