A platform for research: civil engineering, architecture and urbanism
The Risk Analysis and Safety Evaluation of Dam Overtopping At Fengjiashan Reservoir
The Risk Analysis and Safety Evaluation of Dam Overtopping At Fengjiashan Reservoir
The Risk Analysis and Safety Evaluation of Dam Overtopping At Fengjiashan Reservoir
Ying, L. (author) / Naili, G. (author) / Zonglin, W. (author) / Qijun, L. (author) / Ying, S. (author) / Weining, H. (author) / Zhaoyin, W. / International Association of Hydraulic Engineering and Research
World congress; 35th, International Association for Hydro-Environment Engineering and Research ; 2013 ; Chengdu, China
2013-01-01
375 pages
Includes bibliographical references
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Overtopping risk analysis for the earth dam of Qinghe Reservoir
British Library Conference Proceedings | 1996
|Risk Analysis for Dam Overtopping-Feitsui Reservoir as a Case Study
Online Contents | 2007
|Risk Analysis for Dam Overtopping-Feitsui Reservoir as a Case Study
British Library Online Contents | 2007
|Increasing the Economic Benefits of Taihe Reservoir by Means of Overtopping Risk Analysis
British Library Conference Proceedings | 2001
|Applications of Overtopping Risk Analysis for the Earth Dam of Flood Control Reservoir
British Library Conference Proceedings | 2001
|