A platform for research: civil engineering, architecture and urbanism
The Integrated Yard Truck and Yard Crane Scheduling and Storage Allocation Problem at Container Terminals
The Integrated Yard Truck and Yard Crane Scheduling and Storage Allocation Problem at Container Terminals
The Integrated Yard Truck and Yard Crane Scheduling and Storage Allocation Problem at Container Terminals
Chen, L.H. (author) / Gao, Z.J. (author) / Wu, C.J. (author) / Cao, J.X. (author) / Li, Guangfan
International conference; 4th, Civil engineering, architecture and building materials; Sustainable cities development and environment protection IV; CEABM 2014 ; 2014 ; Haikou, China
2014-01-01
4 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
British Library Online Contents | 2009
|Integrated Bay Allocation and Yard Crane Scheduling Problem for Transshipment Containers
British Library Online Contents | 2011
|Tandem Lift Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
British Library Conference Proceedings | 2014
|Load Scheduling of Multiple Yard Crane Systems in Container Terminal with Buffer Areas
British Library Online Contents | 2009
|