A platform for research: civil engineering, architecture and urbanism
REMOVAL OF MAIN STREET DAM: CREATING A THRIVING ECOSYSTEM FROM A DEGRADED AND IMPOUNDED RIVER IN URBAN DOWNTOWN STAMFORD, CONNECTICUT
REMOVAL OF MAIN STREET DAM: CREATING A THRIVING ECOSYSTEM FROM A DEGRADED AND IMPOUNDED RIVER IN URBAN DOWNTOWN STAMFORD, CONNECTICUT
REMOVAL OF MAIN STREET DAM: CREATING A THRIVING ECOSYSTEM FROM A DEGRADED AND IMPOUNDED RIVER IN URBAN DOWNTOWN STAMFORD, CONNECTICUT
Burnett, Adam W. (author) / Vaghar, Siamac (author)
Association of State Dam Safety Officials ; 2016 ; Philadelphia, PA
2016-01-01
9 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
One Atlantic Street Stamford, Connecticut
British Library Online Contents | 1995
|Stamford Reinvents Its Downtown
British Library Online Contents | 1997
|One Atlantic street Stamford, Connecticut - Culpen & Woods, Architects
Online Contents | 1995
Swiss Bank Center, Stamford, Connecticut
British Library Online Contents | 1998
Swiss Bank Center, Stamford, Connecticut
Online Contents | 1998