A platform for research: civil engineering, architecture and urbanism
Sequential Excavation Method with Ground Freezing for DC Water's First Street Tunnel
Sequential Excavation Method with Ground Freezing for DC Water's First Street Tunnel
Sequential Excavation Method with Ground Freezing for DC Water's First Street Tunnel
Hee, Ivan (author) / Bracken, William (author) / Cordes, Harald (author) / Njoloma, Stephen (author)
Rapid excavation and tunneling (Conference)
2017-01-01
10 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Minimum ground pre-freezing time before excavation of Guangzhou subway tunnel
Online Contents | 2006
|Ground Freezing Support for SEM Tunnel Excavation in the Kansas City West Bottoms
British Library Conference Proceedings | 2015
|Performance of Ground Freezing for Excavation Work
British Library Conference Proceedings | 1991
|GROUND FREEZING - Largest frozen ground excavation in North America
Online Contents | 2012
State-of-the-art safety consideration on application of ground freezing to tunnel excavation
British Library Conference Proceedings | 2014
|