A platform for research: civil engineering, architecture and urbanism
Bottom outlets: determining air demand and air vent sizing for small- to medium-sized embankement dams
Bottom outlets: determining air demand and air vent sizing for small- to medium-sized embankement dams
Bottom outlets: determining air demand and air vent sizing for small- to medium-sized embankement dams
Tullis, Blake P. (author)
Large dams (International congress)
2018-01-01
1 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Determining Air Demand for Low-Level Outlet Works for Small and Medium Sized Dams
British Library Conference Proceedings | 2009
|Air Demand of Low-Level Outlets for Large Dams
ASCE | 2020
|Surface spillways and bottom outlets of Turkwel (Kenya) and Katse (Lesotho) dams
British Library Conference Proceedings | 1998
|Development of a Relationship for Air Vent Discharge in Bottom Outlets Using Numerical Simulation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2008
|Capacity of outlets for erosion-control dams
Engineering Index Backfile | 1934
|