A platform for research: civil engineering, architecture and urbanism
Prototype Integrated Cost and Schedule Control System
Prototype Integrated Cost and Schedule Control System
Prototype Integrated Cost and Schedule Control System
Abudayyeh, O. Y. (author) / Rasdorf, W. J. (author)
1993-01-01
181 pages
Article (Journal)
Unknown
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Prototype Integrated Cost and Schedule Control System.
Online Contents | 1993
|Project Numbering System for Integrated Cost and Schedule Control
British Library Conference Proceedings | 2001
|Integrated cost and schedule control for construction projects
TIBKAT | 1986
|Integrated scope-schedule-cost model system for civil works
Tema Archive | 2009
|Integrated Scope-Schedule-Cost Model System for Civil Works
British Library Conference Proceedings | 2009
|