A platform for research: civil engineering, architecture and urbanism
Seepage and Cutoff Measures in the Foundation of the Inguri Arch Dam
Seepage and Cutoff Measures in the Foundation of the Inguri Arch Dam
Seepage and Cutoff Measures in the Foundation of the Inguri Arch Dam
Malyshev, L. I. (author) / Tuzhikhin, G. G. (author)
1993-01-01
55 pages
Article (Journal)
Unknown
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Seepage and cutoff measures in the foundation of the Inguri arch dam
Online Contents | 1993
|Seepage and cutoff measures in the foundation of the Inguri arch dam
Springer Verlag | 1993
|Field investigations of seepage in the Inguri arch dam
Online Contents | 1981
|Field investigations of seepage in the Inguri arch dam
Springer Verlag | 1981
|Engineering-geologic characteristics of the inguri hydroelectric station arch dam foundation
Online Contents | 1974
|