A platform for research: civil engineering, architecture and urbanism
An estimation of ground settlement due to shield tunneling by the Peck-Fujita method
An estimation of ground settlement due to shield tunneling by the Peck-Fujita method
An estimation of ground settlement due to shield tunneling by the Peck-Fujita method
Fang, Y. S. (author) / Lin, J. S. (author) / Su, C. S. (author)
CANADIAN GEOTECHNICAL JOURNAL ; 31 ; 431
1994-01-01
431 pages
Article (Journal)
Unknown
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
An estimation of ground settlement due to shield tunnelling by the Peck-Fujita method
Online Contents | 1994
|Prediction of ground settlement by Peck-Fujita and numerical methods
British Library Conference Proceedings | 2006
|Estimation of transverse ground surface settlement induced by DOT shield tunneling
British Library Online Contents | 2013
|Estimation of transverse ground surface settlement induced by DOT shield tunneling
Online Contents | 2013
|Surface settlement prediction for EPB shield tunneling in sandy ground
Online Contents | 2017
|