A platform for research: civil engineering, architecture and urbanism
Effects of Tow Sequencing on Capacity and Delay at a Waterway Lock
Effects of Tow Sequencing on Capacity and Delay at a Waterway Lock
Effects of Tow Sequencing on Capacity and Delay at a Waterway Lock
Ting, C.-J. (author) / Schonfeld, P. (author)
JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING ; 122 ; 16-26
1996-01-01
11 pages
Article (Journal)
English
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Effects of Tow Sequencing on Capacity and Delay at a Waterway Lock
Online Contents | 1996
|Improved Analytical Model for Estimating the Capacity of a Waterway Lock
British Library Online Contents | 2018
|Control Alternatives at a Waterway Lock
British Library Online Contents | 2001
|Modeling Shipper Response to Scheduled Waterway Lock Closures
British Library Online Contents | 2006
|