A platform for research: civil engineering, architecture and urbanism
Construction Through Crude Oil: Engineers of the Hilltop Interceptor tunneling project in Cleveland didn't let oil-saturated sandstone delay construction of necessary shafts
Construction Through Crude Oil: Engineers of the Hilltop Interceptor tunneling project in Cleveland didn't let oil-saturated sandstone delay construction of necessary shafts
Construction Through Crude Oil: Engineers of the Hilltop Interceptor tunneling project in Cleveland didn't let oil-saturated sandstone delay construction of necessary shafts
Ott, K. R. (author) / Switalski, R. J. (author) / Sadowski, D. J. (author)
CIVIL ENGINEERING -NEW YORK- ; 66 ; 56-59
1996-01-01
4 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Hilltop Interceptor Contract G Storage and Conveyance Tunnel, Cleveland, Ohio
British Library Conference Proceedings | 1997
|The Heights-Hilltop Interceptor: An Ongoing Success
Online Contents | 1994
|The Heights-Hilltop Interceptor: An Ongoing Success
British Library Conference Proceedings | 1993
|British Library Conference Proceedings | 2009
|Groundwater inflow problems in tunneling at west leg interceptor contract 3, Cleveland, Ohio
British Library Conference Proceedings | 1995
|