A platform for research: civil engineering, architecture and urbanism
Applying an analytical approach to shop-floor scheduling: a case study
Applying an analytical approach to shop-floor scheduling: a case study
Applying an analytical approach to shop-floor scheduling: a case study
Swinehart, K. (author) / Yasin, M. (author) / Guimaraes, E. (author)
1996-01-01
10 pages
Article (Journal)
English
DDC:
620.11
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Applying an analytical approach to shop–floor scheduling: a case study
British Library Online Contents | 1996
|British Library Online Contents | 2002
|IET Digital Library Archive | 1995
Shop floor data collection news
IET Digital Library Archive | 1994
Genba Kanri: shop floor management
IET Digital Library Archive | 1997