A platform for research: civil engineering, architecture and urbanism
Crowning glory: Construction of a gouted slab above the Thames Tunnel in London is enabling partial presetvation of Brunel's historic structure
Crowning glory: Construction of a gouted slab above the Thames Tunnel in London is enabling partial presetvation of Brunel's historic structure
Crowning glory: Construction of a gouted slab above the Thames Tunnel in London is enabling partial presetvation of Brunel's historic structure
GROUND ENGINEERING ; 30 ; 18-20
1997-01-01
3 pages
Article (Journal)
English
DDC:
625
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The strengthening of Brunel's Thames Tunnel
British Library Online Contents | 1998
|BRUNEL'S THAMES TUNNEL - The great bore
Online Contents | 1993
|Brunel's Thames Tunnel: The Great Bore
British Library Online Contents | 1993
|ASCE | 2018
|