A platform for research: civil engineering, architecture and urbanism
Surveys at the Merowe Hydro Development in the Sudan for a Reliable Substantiation of the Project: Engineering-Geologic Conditions and Characteristics of the Method of Investigations
Surveys at the Merowe Hydro Development in the Sudan for a Reliable Substantiation of the Project: Engineering-Geologic Conditions and Characteristics of the Method of Investigations
Surveys at the Merowe Hydro Development in the Sudan for a Reliable Substantiation of the Project: Engineering-Geologic Conditions and Characteristics of the Method of Investigations
Piotrovskii, A. S. (author)
1996-01-01
5 pages
Article (Journal)
English
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Numerische Modellierung der Verlandungsprozesse des Merowe Stauraums am Nil im Sudan
British Library Conference Proceedings | 2008
|Engineering-geologic substantiation on the design of cutoffs
Online Contents | 1974
|Engineering-geologic substantiation on the design of cutoffs
Springer Verlag | 1974
|