A platform for research: civil engineering, architecture and urbanism
Observations of Ground Movements during Tunnel Construction by Slurry Shield Method at the Docklands Light Railway Lewisham Extention - East London
Observations of Ground Movements during Tunnel Construction by Slurry Shield Method at the Docklands Light Railway Lewisham Extention - East London
Observations of Ground Movements during Tunnel Construction by Slurry Shield Method at the Docklands Light Railway Lewisham Extention - East London
Sugiyama, T. (author) / Hagiwara, T. (author) / Nomoto, T. (author) / Nomoto, M. (author) / Ano, Y. (author) / Mair, R. J. (author) / Bolton, M. D. (author) / Soga, K. (author) / Kusakabe, O. / Aruoka, A.
1999-01-01
14 pages
Article (Journal)
Unknown
DDC:
624.151
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Ground treatment on the Docklands Light Railway Lewisham Extension
British Library Conference Proceedings | 1999
|Compensation grouting at the Docklands Light Railway Lewisham Extension project
British Library Conference Proceedings | 2000
|Docklands rail heads to Lewisham
British Library Online Contents
Docklands Light Railway Beckton Extension London
British Library Online Contents | 1998