A platform for research: civil engineering, architecture and urbanism
Koyna hydroelectric project - Stages I, II, III and IV - double lake tapping
Koyna hydroelectric project - Stages I, II, III and IV - double lake tapping
Koyna hydroelectric project - Stages I, II, III and IV - double lake tapping
Desai, S. K. (author) / Sapre, S. D. (author)
INDIAN JOURNAL OF POWER AND RIVER VALLEY DEVELOPMENT ; 49 ; 149-157
1999-01-01
9 pages
Article (Journal)
English
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Koyna hydroelectric plant -- European development
Engineering Index Backfile | 1965
|Koyna Hydro Electric Project (Stages I, II, III and IV)
British Library Conference Proceedings | 1999
|Seismic survey for piercing of an underwater tunnel for Koyna Hydroelectric Project, India
British Library Online Contents | 1997
|Seismic survey for piercing of an underwater tunnel for Koyna Hydroelectric Project, India
Online Contents | 1998
|Under Water Lake Piercing in Koyna Hydro Electric Project Stage-IV
British Library Conference Proceedings | 2000
|