A platform for research: civil engineering, architecture and urbanism
Measured Pile Setup During Load Testing and Production Piling: I-15 Corridor Reconstruction Project in Salt Lake City, Utah
Measured Pile Setup During Load Testing and Production Piling: I-15 Corridor Reconstruction Project in Salt Lake City, Utah
Measured Pile Setup During Load Testing and Production Piling: I-15 Corridor Reconstruction Project in Salt Lake City, Utah
Attwooll, W. J. (author) / Holloway, D. M. (author) / Rollins, K. M. (author) / Esrig, M. I. (author) / Sakhai, S. (author) / Hemenway, D. (author)
1999-01-01
7 pages
Article (Journal)
English
DDC:
388
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Measured Pile Setup During Load Testing and Production Piling I-15 Corridor Reconstruction Project
British Library Conference Proceedings | 2001
|Pile Test Results - I-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only)
British Library Conference Proceedings | 1998
|Engineering Geology of the I-15 Corridor, Salt Lake County, Utah
British Library Conference Proceedings | 1999
|Pavements in Salt Lake City, Utah
Engineering Index Backfile | 1908
Salt Lake City West/East Corridor LRT
British Library Conference Proceedings | 1998
|