A platform for research: civil engineering, architecture and urbanism
Noisiest roads resurfaced within 3 years says HA
Noisiest roads resurfaced within 3 years says HA
Noisiest roads resurfaced within 3 years says HA
2001-01-01
4 pages
Article (Journal)
English
DDC:
625.7
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Oiled macadam roads resurfaced with concrete
Engineering Index Backfile | 1918
|Brick resurfaced with concrete on Iowa paving project
Engineering Index Backfile | 1933
Barge decks resurfaced with asphalt
Engineering Index Backfile | 1965
|