A platform for research: civil engineering, architecture and urbanism
Construction of the Third Millennium Jean-Paul Il Bridge on Sucharski road in Gdansk. The first Polish cable-stayed bridge built by cantilevering
Construction of the Third Millennium Jean-Paul Il Bridge on Sucharski road in Gdansk. The first Polish cable-stayed bridge built by cantilevering
Construction of the Third Millennium Jean-Paul Il Bridge on Sucharski road in Gdansk. The first Polish cable-stayed bridge built by cantilevering
Mossot, J. (author)
TRAVAUX -PARIS- FRENCH EDITION- ; 37-54
2001-01-01
18 pages
Article (Journal)
French
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Third Millennium Bridge, Gdansk, Poland
British Library Online Contents | 2002
|Canadian, U.S. contractors built New Soo Bridge by cantilevering
Engineering Index Backfile | 1962
Recent Structures - Third Millennium Bridge, Gdansk, Poland
Online Contents | 2002
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|