A platform for research: civil engineering, architecture and urbanism
Case Study: Channel Stability of the Missouri River, Eastern Montana
Case Study: Channel Stability of the Missouri River, Eastern Montana
Case Study: Channel Stability of the Missouri River, Eastern Montana
Simon, A. (author) / Thomas, R. E. (author) / Curini, A. (author) / Shields, F. D. (author)
JOURNAL OF HYDRAULIC ENGINEERING -NEW YORK- ; 128 ; 880-890
2002-01-01
11 pages
Article (Journal)
English
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case Study: Channel Stability of the Missouri River, Eastern Montana
Online Contents | 2002
|Missouri river bridge, Montana
Engineering Index Backfile | 1930
|Channel Rectification for Castor River, Missouri: A Case Study
British Library Conference Proceedings | 1995
|Modifications of control shaft, fort peck dam tunnel 4, Missouri river, Montana
Engineering Index Backfile | 1959
|