A platform for research: civil engineering, architecture and urbanism
Integrated Approach to Total Maximum Daily Load Development for Neuse River Estuary using Bayesian Probability Network Model (Neu-BERN)
Integrated Approach to Total Maximum Daily Load Development for Neuse River Estuary using Bayesian Probability Network Model (Neu-BERN)
Integrated Approach to Total Maximum Daily Load Development for Neuse River Estuary using Bayesian Probability Network Model (Neu-BERN)
Borsuk, M. E. (author) / Stow, C. A. (author) / Reckhow, K. H. (author)
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT ; 129 ; 271-282
2003-01-01
12 pages
Article (Journal)
English
DDC:
333.91
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A CE-QUAL-W2 Model of Neuse Estuary for Total Maximum Daily Load Development
Online Contents | 2003
|A CE-QUAL-W2 Model of Neuse Estuary for Total Maximum Daily Load Development
British Library Online Contents | 2003
|British Library Online Contents | 2003
|