A platform for research: civil engineering, architecture and urbanism
Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period
Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period
Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period
Peng, Y. (author) / Li, Y.-t. (author) / Zhang, H.-w. (author)
ADVANCES IN WATER SCIENCE ; 14 ; 682-689
2003-01-01
8 pages
Article (Journal)
Unknown
DDC:
553.7
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A Study on Optimization of Limited Water Level and Water Impounding Time of Three Gorges Project
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2008
|British Library Conference Proceedings | 2004
|Impounding in Advance for Three Gorges Reservoir by Considering the Downstream Drought Resistance
British Library Conference Proceedings | 2013
|Engineering Index Backfile | 1928
|Design Flood Volume of the Three Gorges Dam Project
British Library Online Contents | 2011
|