A platform for research: civil engineering, architecture and urbanism
Strip charge chamber blasting of quarry in Wushan Copper Mine
Strip charge chamber blasting of quarry in Wushan Copper Mine
Strip charge chamber blasting of quarry in Wushan Copper Mine
Jiao, Y.-b. (author) / Liu, L.-s. (author)
NONFERROUS METALS -BEIJING- ; 56 ; 112-114
2004-01-01
3 pages
Article (Journal)
Unknown
DDC:
669
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
On the Seepage Stability of a Tailing Dam in Wushan Copper Mine
Tema Archive | 2012
|On the Seepage Stability of a Tailing Dam in Wushan Copper Mine
British Library Conference Proceedings | 2012
|On the Seepage Stability of a Tailing Dam in Wushan Copper Mine
Trans Tech Publications | 2012
|Treatment of waste water from water-gas production of Wushan Copper Mine
British Library Online Contents | 1999
|Seismic effects of quarry blasting
Engineering Index Backfile | 1942
|