A platform for research: civil engineering, architecture and urbanism
Settlement of Dredged and Contaminated Material Placement Areas. II: Primary Consolidation, Secondary Compression, and Desiccation of Dredged Fill Input Parameters
Settlement of Dredged and Contaminated Material Placement Areas. II: Primary Consolidation, Secondary Compression, and Desiccation of Dredged Fill Input Parameters
Settlement of Dredged and Contaminated Material Placement Areas. II: Primary Consolidation, Secondary Compression, and Desiccation of Dredged Fill Input Parameters
Stark, T. D. (author) / Choi, H. (author) / Schroeder, P. R. (author)
JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING ; 131 ; 52-61
2005-01-01
10 pages
Article (Journal)
English
DDC:
627
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2005
|