Method for Calculating Schedule Delay Considering Lost Productivity
Method for Calculating Schedule Delay Considering Lost Productivity
Method for Calculating Schedule Delay Considering Lost Productivity
Lee, H.-S. (author) / Ryu, H.-G. (author) / Yu, J.-H. (author) / Kim, J.-J. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 131 ; 1147-1154
2005-01-01
8 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Method for Calculating Schedule Delay Considering Lost Productivity
Online Contents | 2005
|Incorporating lost productivity calculation into delay analysis for construction projects
Springer Verlag | 2014
|Incorporating lost productivity calculation into delay analysis for construction projects
Online Contents | 2014
|Computerizing ICBF Method for Schedule Delay Analysis
British Library Online Contents | 2011
|Computerizing ICBF Method for Schedule Delay Analysis
Online Contents | 2011
|