A platform for research: civil engineering, architecture and urbanism
Pore water pressure and horizontal stress changes measured during construction of a contiguous bored pile multi-propped retaining wall in Lower Cretaceous clays
Pore water pressure and horizontal stress changes measured during construction of a contiguous bored pile multi-propped retaining wall in Lower Cretaceous clays
Pore water pressure and horizontal stress changes measured during construction of a contiguous bored pile multi-propped retaining wall in Lower Cretaceous clays
Richards, D. J. (author) / Powrie, W. (author) / Roscoe, H. (author) / Clark, J. (author)
GEOTECHNIQUE -LONDON- ; 57 ; 197-206
2007-01-01
10 pages
Article (Journal)
English
DDC:
551
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|