A platform for research: civil engineering, architecture and urbanism
Assessing the Flaws in Welded Seam of Header of a 300MW Steam Turbine Generator Unit
Assessing the Flaws in Welded Seam of Header of a 300MW Steam Turbine Generator Unit
Assessing the Flaws in Welded Seam of Header of a 300MW Steam Turbine Generator Unit
Song, L. (author) / Yang, S. C. (author) / Wei, F. T. (author)
KEY ENGINEERING MATERIALS ; 340/341 ; 1431-1436
2007-01-01
6 pages
Article (Journal)
English
DDC:
620.11
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2014
|INSIGHT - Raising funds for India's 300MW Baspa II project
Online Contents | 2002
An Investigation on Inducd-draft Fan Vibrations in a 300MW Unit of Shimen Power Plant
British Library Online Contents | 2003
|Creep analysis of steam turbine welded diaphragm
British Library Online Contents | 2012
|