A platform for research: civil engineering, architecture and urbanism
Estimating productivity using simulation: a case study of Gaza beach embankment protection project
Estimating productivity using simulation: a case study of Gaza beach embankment protection project
Estimating productivity using simulation: a case study of Gaza beach embankment protection project
Rustom, R. N. (author) / Yahia, A. (author)
CONSTRUCTION INNOVATION -LONDON- ; 7 ; 167-186
2007-01-01
20 pages
Article (Journal)
English
DDC:
690
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Overflow Protection of an Embankment Using Geogrid (A Case Study)
British Library Conference Proceedings | 1993
|Water conservancy project embankment wave-resistant protection device
European Patent Office | 2023
|Estimating Embankment Settlement from Piezocone Penetration Test Data: Case Study
British Library Online Contents | 2011
|Estimating productivity using simulation
Emerald Group Publishing | 2007
|