A platform for research: civil engineering, architecture and urbanism
A case study: delayed failure of a deep cutting in lodgement till
A case study: delayed failure of a deep cutting in lodgement till
A case study: delayed failure of a deep cutting in lodgement till
Hughes, D. (author) / Sivakumar, V. (author) / Glynn, D. (author) / Clarke, G. (author)
2007-01-01
10 pages
Article (Journal)
English
DDC:
624.15
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A case study: delayed failure of a deep cutting in lodgement till
Online Contents | 2007
|CFA pile behaviour in very stiff lodgement till
British Library Online Contents | 2008
|CFA pile behaviour in very stiff lodgement till
Online Contents | 2008
|Estimating ground movements in a very stiff lodgement till
British Library Conference Proceedings | 2001
|Stiffness and strength characteristics of a hard lodgement till
British Library Conference Proceedings | 1998
|