A platform for research: civil engineering, architecture and urbanism
Reliability Analysis of Shotcrete Lining during Tunnel Construction
Reliability Analysis of Shotcrete Lining during Tunnel Construction
Reliability Analysis of Shotcrete Lining during Tunnel Construction
Yang, C.Y. (author) / Xu, M.X. (author) / Chen, W.F. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 133 ; 975-981
2007-01-01
7 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Reliability Analysis of Shotcrete Lining during Tunnel Construction
Online Contents | 2007
|Monocoque Tunnel Lining with Shotcrete
British Library Online Contents | 1996
Fibre reinforced shotcrete lining at the Covanca Tunnel
British Library Conference Proceedings | 1998
|Shotcrete as a tunnel lining - A laboratory study
British Library Conference Proceedings | 1995
|HONG KONG - SHOTCRETE SUPPORT: Shotcrete as a permanent lining to a TBM tunnel
Online Contents | 1997
|