A platform for research: civil engineering, architecture and urbanism
Prediction of time to crack initiation in reinforced concrete exposed to chloride
CONSTRUCTION AND BUILDING MATERIALS ; 22 ; 1100-1107
2008-01-01
8 pages
Article (Journal)
English
DDC:
690
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Prediction of time to crack initiation in reinforced concrete exposed to chloride
Online Contents | 2008
|Prediction of time to crack initiation in reinforced concrete exposed to chloride
Online Contents | 2008
|British Library Online Contents | 2013
|Prediction of Time to Crack Reinforced Concrete by Chloride Induced Corrosion
BASE | 2017
|