A platform for research: civil engineering, architecture and urbanism
Prediction of erosion depth under the action of the exceptional flood in the river reach of a tunnel across the Qiantang estuary
Prediction of erosion depth under the action of the exceptional flood in the river reach of a tunnel across the Qiantang estuary
Prediction of erosion depth under the action of the exceptional flood in the river reach of a tunnel across the Qiantang estuary
Shi, Y.-b. (author) / Lu, H.-y. (author) / Yang, Y.-p. (author) / Cao, Y. (author)
ADVANCES IN WATER SCIENCE ; 19 ; 692-697
2008-01-01
6 pages
Article (Journal)
Unknown
DDC:
553.7
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Influences of Topographical Change of Qiantang River on Design Flood of Puyang River
Tema Archive | 2013
|Influences of Topographical Change of Qiantang River on Design Flood of Puyang River
British Library Conference Proceedings | 2013
|Application of 1-D Mobile-Bed Model in Flood Prevention of the Qiantang Estuary
British Library Conference Proceedings | 2004
|Monitoring of Large Section Tunnel Crossing Qiantang River during Operation Period
Trans Tech Publications | 2012
|