A platform for research: civil engineering, architecture and urbanism
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
Chen, P. H. (author) / Shahandashti, S. M. (author)
AUTOMATION IN CONSTRUCTION ; 18 ; 434-443
2009-01-01
10 pages
Article (Journal)
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
Online Contents | 2015
|