A platform for research: civil engineering, architecture and urbanism
LO-09-27 Required Duration for Borehole Test Validated by Field Data
LO-09-27 Required Duration for Borehole Test Validated by Field Data
LO-09-27 Required Duration for Borehole Test Validated by Field Data
Liu, Y.D. (author) / Beier, R.A. (author)
2009-01-01
11 pages
Article (Journal)
English
DDC:
621
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
ASCE | 2017
|Online Contents | 2017
|Criteria for defining the required duration of a creep test
Online Contents | 2015
|Criteria for defining the required duration of a creep test
British Library Online Contents | 2015
|Correlating Borehole Data with Resistivity Test Results
British Library Conference Proceedings | 2001
|