Analyzing the Duration and Prolongation of Performance-Based Contracts Through Hazard-Based Duration and Zero-Inflated Random Parameters Poisson Models
Analyzing the Duration and Prolongation of Performance-Based Contracts Through Hazard-Based Duration and Zero-Inflated Random Parameters Poisson Models
Analyzing the Duration and Prolongation of Performance-Based Contracts Through Hazard-Based Duration and Zero-Inflated Random Parameters Poisson Models
Anastasopoulos, P.C. (author) / Labi, S. (author) / McCullouch, B.G. (author)
TRANSPORTATION RESEARCH RECORD ; 11-19
2009-01-01
9 pages
Article (Journal)
English
DDC:
388
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Analysis of E-bike Trip Duration and Frequency by Bayesian Duration and Zero-inflated Count Models
Online Contents | 2019
|Analysis of E-bike Trip Duration and Frequency by Bayesian Duration and Zero-inflated Count Models
Springer Verlag | 2019
|