A platform for research: civil engineering, architecture and urbanism
Estimating an Impedance-to-Flow Parameter for Flood Peak Prediction in Semiarid Watersheds
Estimating an Impedance-to-Flow Parameter for Flood Peak Prediction in Semiarid Watersheds
Estimating an Impedance-to-Flow Parameter for Flood Peak Prediction in Semiarid Watersheds
Stewart, D. (author) / Canfield, E. (author) / Yitayew, M. (author) / Nichols, M. (author)
JOURNAL OF HYDROLOGIC ENGINEERING ; 15 ; 182-190
2010-01-01
9 pages
Article (Journal)
Unknown
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Estimating an Impedance-to-Flow Parameter for Flood Peak Prediction in Semiarid Watersheds
Online Contents | 2010
|Distributed Model for Small Semiarid Watersheds
ASCE | 2021
|