A platform for research: civil engineering, architecture and urbanism
Using the MD CAD model to develop the time cost integrated schedule for construction projects
Using the MD CAD model to develop the time cost integrated schedule for construction projects
Using the MD CAD model to develop the time cost integrated schedule for construction projects
Feng, C. W. (author) / Chen, Y. J. (author) / Huang, J. R. (author)
AUTOMATION IN CONSTRUCTION ; 19 ; 347-356
2010-01-01
10 pages
Article (Journal)
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Using the MD CAD model to develop the time cost integrated schedule for construction projects
British Library Conference Proceedings | 2010
|Integrated cost and schedule control for construction projects
TIBKAT | 1986
|