A platform for research: civil engineering, architecture and urbanism
Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Concept Development
Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Concept Development
Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Concept Development
Li, L. (author) / Ma, Z. (author) / Griffey, M.E. (author) / Oesterle, R.G. (author)
JOURNAL OF BRIDGE ENGINEERING ; 15 ; 327-336
2010-01-01
10 pages
Article (Journal)
English
DDC:
624.2
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 2010
|Continuous CFRP decked bulb T beam bridges for accelerated bridge construction
European Patent Office | 2016
|Effect of Intermediate Diaphragms on Decked Bulb-Tee Bridge System for Accelerated Construction
Online Contents | 2010
|Effect of Intermediate Diaphragms on Decked Bulb-Tee Bridge System for Accelerated Construction
British Library Online Contents | 2010
|