A platform for research: civil engineering, architecture and urbanism
Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
Bhargava, A. (author) / Anastasopoulos, P.C. (author) / Labi, S. (author) / Sinha, K.C. (author) / Mannering, F.L. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 136 ; 1207-1218
2010-01-01
12 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
Online Contents | 2010
|Cost Overruns on State of Washington Construction Contracts
British Library Conference Proceedings | 1992
|Cost Overruns on State of Washington Construction Contracts
British Library Online Contents | 1992
|Root-Cause Analysis of Construction-Cost Overruns
ASCE | 2013
|Root-Cause Analysis of Construction-Cost Overruns
Online Contents | 2014
|