A platform for research: civil engineering, architecture and urbanism
Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting
Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting
Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting
Hariga, M. (author) / El-Sayegh, S.M. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 137 ; 56-64
2011-01-01
9 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting
Online Contents | 2011
|Binary Resource Leveling Model: Activity Splitting Allowed
British Library Online Contents | 2004
|Binary Resource Leveling Model: Activity Splitting Allowed
Online Contents | 2004
|Multiresource Leveling in Line-of-Balance Scheduling
ASCE | 2013
|Multiresource Leveling in Line-of-Balance Scheduling
British Library Online Contents | 2013
|