A platform for research: civil engineering, architecture and urbanism
Construction of Cable Stayed Bridge Over River Ravi at Basohli-A Case Study
Construction of Cable Stayed Bridge Over River Ravi at Basohli-A Case Study
Construction of Cable Stayed Bridge Over River Ravi at Basohli-A Case Study
Yadav, V.K. (author) / Rai, R. (author)
INDIAN HIGHWAYS ; 39 ; 29-42
2011-01-01
14 pages
Article (Journal)
English
DDC:
625.7
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|Cable-Stayed Bridge over the Guama River, Brazil
British Library Online Contents | 2003
|The cable-stayed bridge over the PO river
British Library Conference Proceedings | 2003
|The Cable-Stayed Bridge Over the Garigliano River
British Library Online Contents | 1996
|Cable-Stayed Bridge over the River Rhone, France
British Library Online Contents | 2000
|