A platform for research: civil engineering, architecture and urbanism
Reservoir Reoperation for Fish Ecosystem Restoration Using Daily Inflows-Case Study of Lake Shelbyville
Reservoir Reoperation for Fish Ecosystem Restoration Using Daily Inflows-Case Study of Lake Shelbyville
Reservoir Reoperation for Fish Ecosystem Restoration Using Daily Inflows-Case Study of Lake Shelbyville
Yang, Y.-C.E. (author) / Cai, X. (author)
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT ; 137 ; 470-480
2011-01-01
11 pages
Article (Journal)
English
DDC:
333.91
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Evaluation of spiral-blade concrete mixer, shelbyville reservoir project, shelbyville, illinois
Engineering Index Backfile | 1968
|Evolutionary Computation for Simulating Reservoir Release Rates of Lake Shelbyville and Carlyle Lake
British Library Conference Proceedings | 2012
|British Library Online Contents | 2011
|