A platform for research: civil engineering, architecture and urbanism
Case Analysis on Corrosion-scaling for Sucker Rod and Tubing of Oil Well and Countermeasures
Case Analysis on Corrosion-scaling for Sucker Rod and Tubing of Oil Well and Countermeasures
Case Analysis on Corrosion-scaling for Sucker Rod and Tubing of Oil Well and Countermeasures
Geng, Yuguang (author) / Zhang, Wei (author) / Liu, Yun (author) / Ma, Xiurong (author) / Xiao, Jian (author) / Zhu, Kehua (author)
Fu shi ke xue yu fang hu ji shu = ; 27 ; 305-309
2015-01-01
5 pages
Article (Journal)
Unknown
DDC:
620.11223
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Corrosion Inhibitor Uninterrupted Pumping Injection Device and Tubing Sucker Rod Corrosion Control
British Library Online Contents | 2001
|British Library Online Contents | 2000
|Corrosion and Scaling-control for Tubing and Casing of Sewage Reinjection Well
British Library Online Contents | 2015
|Scaling Corrosion Analysis and Control Measures of Downhold Tubing in Yakela Wells
British Library Online Contents | 2013
|Corrosion Case Analysis and Countermeasures for Furfural Fefining Unit
British Library Online Contents | 2015
|