A platform for research: civil engineering, architecture and urbanism
Solution to the Multidepot Inventory Slack-Routing Problem at the Planning Stage
Solution to the Multidepot Inventory Slack-Routing Problem at the Planning Stage
Solution to the Multidepot Inventory Slack-Routing Problem at the Planning Stage
Yang, Xianfeng (author) / Zhu, Shanjiang (author)
Journal of computing in civil engineering ; 30 ; 04014115-04014115
2016-01-01
1 pages
Article (Journal)
English
DDC:
624.0285
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Solution to the Multidepot Inventory Slack-Routing Problem at the Planning Stage
Online Contents | 2016
|Collaborative Multidepot Vehicle Routing Problem with Dynamic Customer Demands and Time Windows
DOAJ | 2022
|Multidepot Vehicle Routing with Uncertain Demands: Chance Constrained Approach
British Library Online Contents | 2004
|Inventory Routing Problem: Routing and Scheduling Approach with the Objective of Slack Maximization
British Library Online Contents | 2013
|