A platform for research: civil engineering, architecture and urbanism
Failure analysis of a cracked Q125 casing for ultra-deep wells at the Tarim Oilfield
Failure analysis of a cracked Q125 casing for ultra-deep wells at the Tarim Oilfield
Failure analysis of a cracked Q125 casing for ultra-deep wells at the Tarim Oilfield
Materialprüfung ; 60 ; 1026-1032
2018-01-01
7 pages
Article (Journal)
Unknown
DDC:
620
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Investigation on Production Casing in Steam-Injection Wells and the Application in Oilfield
British Library Online Contents | 2009
|British Library Online Contents | 2007
|Cementing of deep oil wells by injecting cement outside casing
Engineering Index Backfile | 1966
|Reasons for Tube Corrosion in a Gas Well Due to Acidizing in Tarim Oilfield
British Library Online Contents | 2016
|Corrosion Resistance of Vacuum Gas Nitriding Well Casing in Changqing Oilfield
British Library Online Contents | 2004
|