A platform for research: civil engineering, architecture and urbanism
The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project
The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project
The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project
Zare Naghadehi, Masoud (author) / Benardos, Andreas (author) / Javdan, Rouhollah (author) / Tavakoli, Hamidreza (author) / Rojhani, Mahdi (author)
Tunnelling and underground space technology ; 58 ; 11-29
2016-01-01
19 pages
Article (Journal)
English
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project
British Library Online Contents | 2016
|The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project
Online Contents | 2016
|The probabilistic time and cost risk analysis of a challenging part of an urban tunneling project
British Library Online Contents | 2016
|Wienerwaldtunnel - a challenging tunneling project
British Library Conference Proceedings | 2007
|Probabilistic Model for Tunneling Project Using Markov Chain
Online Contents | 1997
|